Austin DSD

Austin building permits, read every day.

7,980 permits filed in the last 90 days, about 88.7 a day. Every one is scored for which trade it feeds and how likely it is to become a job.

7,980Permits, 90 days
88.7Filed per day
24ZIPs with activity
4Trades scored
By trade

Which of these are your leads.

Each figure is a counted query against Austin’s own permit descriptions over the last 90 days. It is the pool a trade could draw from, before scoring drops the filings that are not worth a call.

What Austin is actually building

Most common permit types.

These are Austin DSD’s own labels, grouped by the city rather than by us. They are useful for reading the shape of the market and useless for finding a lead: a re-roof and a ground-up build can share one label, which is why the trade counts above read the free-text description instead.

Electrical Permit2,418 · 30%
Mechanical Permit2,013 · 25%
Plumbing Permit1,959 · 25%
Building Permit1,513 · 19%
Driveway / Sidewalks77 · 1%
Busiest areas

Where the filings are.

The ZIPs Austin filed the most permits in over the last 90 days. A territory is one of these plus one trade, so this is also the shortlist worth buying. Every one runs live against your own trade and needs no account.

Method

Where every number here comes from.

The source

Austin DSD, dataset 3syk-w9eu on data.austintexas.gov. An official Socrata API, queried directly. Counts on this page are aggregate queries, so reading it never pulls a permit row.

The window

The last 90 days by filing date. Ninety days is long enough to be stable against a slow week and short enough that the number still describes the market you are selling into now.

Freshness

Newest record 2026-09-08, 1 days old at the last check. A feed with nothing newer than 21 days is treated as abandoned and pulled from the product rather than quietly served.

What is not here

Owner names and phone numbers. Those are not in the permit record; they are resolved per property on demand inside the product and screened against do-not-call lists before anyone sees them.

Questions

How many building permits are filed in Austin each day?

About 88.7 a day, 7,980 over the last 90 days, measured from Austin DSD's own open-data feed.

Where does Austin permit data come from?

Directly from the city's Socrata open-data portal at data.austintexas.gov, dataset 3syk-w9eu. It is an official government API, not a scraped page, and it is read once a day.

Can I get Austin permits as sales leads?

Yes. EarlyIntent scores every permit for buying intent by trade, solar, roofing, HVAC and real estate, and delivers a ranked feed carrying the reason each one scored and the next step to take. A territory is one trade in one geography, and on Pro and above it is exclusive to you.

How fresh is the Austin feed?

The newest record in Austin DSD's dataset is dated 2026-09-08, 1 days old at the last check. Anything with nothing newer than 21 days is treated as abandoned and pulled from the product, because two of the seven city datasets originally evaluated had silently stopped updating years earlier while still serving hundreds of thousands of rows.

Which trade gets the most from Austin?

HVAC & electrification on current volume: 1,322 of the last 90 days of filings mention that work. That is the pool before scoring, not the size of a feed.

Is this scraped?

No. Austin DSD publishes this dataset through a Socrata open-data API, and EarlyIntent queries it the way any member of the public can. Nothing is scraped from a web page, nothing is bought from a broker, and no permit record here is anything other than public record.

Check your ZIPAll metros